Referenzen - geordnet nach Produkten

USA, Corinth, MS, Magnolia Regional Health Center




Objektum
Magnolia Regional Health Center 
Felhasználási terület
Dampfsperren auf nicht abgedichteten Betonböden
Leírás
This application is an add-on, approx. 45,000 sq ft, to the existing Magnolia Regional Health Center in Corinth, MS. Because these were new concrete slabs that were poured, moisture mitigation was necessary for a successful flooring installation. KOSTER VAP I 2000 UFS was the product chosen to control moisture vapor permeating up through the slab. Because of multiple construction trades on the job site, flooring was in a fast track schedule. The KOSTER VAP I 2000 UFS cures in 2-3 hours, which accommodates this fast paced schedule. KOSTER VAP I 06 Primer was then installed prior to installing KOSTER SL Standard, a self-leveling underlayment. The KOSTER SL Standard provides a smooth, level surface to receive various types of finished flooring after 24 hours. 
Alkalmazott anyagok
KÖSTER VAP I 06 Grundierung
KÖSTER VAP I 2000 UFS
Kivitelező
Solid Surface Technology 
Termék kiválasztása:

 

 

Back

Top
Albania Austria Bosnia and Herzegovina Brasil Bulgaria China Croatia Czech Republic Denmark Finland Germany Ghana Greece Hungary Italy Japan Kazakhstan Kuwait Latvia Lebanon Macedonia Mexico Netherlands New Zealand Norway Panama Poland Portugal Romania Russia Senegal Serbia Slovakia Slovenia South Africa Spain Thailand Turkey Ukraine United Kingdom United States of America